Case Studies

OEM no longer available so the gearbox was returned to Re-mech for re-engineeringHigh bearing temperatures had been recorded whilst in serviceNew GA Drawing prepared together with all component drawings for client

Case Study 2


Scope of Project

 

  • Dis-assemble gearbox and clean all component parts
  • Record findings of each part
  • Prepare manufacturing drawings of all parts
  • Prepare new GA drawing
  • Manufacture new parts as required for gearbox
  • Re-assemble and no load test gearbox

 

Summary

 

The client now has comprehensive information and drawings to be able to maintain and service these gearboxes in the future and is now working with us to provide support for other obsolete rotating equipment.



New parts manufactured and fitted
Gearbox complete following no load test run